Creating a Fabrication Weld Log

From ProStar Geocorp

This section covers how to create a Fabrication Weld Log in PointMan


Procedure

  1. Log into PM:
  2. Prod2\YourUserName
  3. Enter your Password
  4. Tap Sign In.
  5. Tap Menu button.
  6. Tap Search.
  7. First dialog box: select Fabrication Weld Report.
  8. Third dialog box: select Inspector, then enter the Inspector Name.
  9. Fourth dialog box: select WPS Number:
  10. Enter the WPS Number in the WPS Number field.
  11. Tap Search.
  12. To create a new record line, tap New
    A blank Fabrication Weld Report page displays.

      Or, to modify an existing line, tap the applicable line, then tap Edit.

  1. Fill out the Fabrication Weld Report page.
  2. Tap Save (upper right corner). 
    You will be returned to the Search results page where your new Point and your new Weld Log Report record will display.